oil separation plant (GOSP) and wet crude handling facilities to process crude from the three fields, gas gathering compression facilities, a cogeneration plant, crude stabilization and water injection. A consortium of Bechtel Overseas of London and Technip of Rome was selected for the Khursaniyah Gas Plant. The scope of work covers construction of two trains of gas conditioning and ethane and NGL recovery with a total capacity of 1.0 billion standard cubic feet per day (scf/d). The facilities will produce 550 million scf/d of sales gas and 240,000 b/d of ethane & NGL and 1,800 metric tons (mt) of sulfur. Saudi Aramco also awarded five contracts to build the world's largest NGL processing plant at Hawiyah to recover ethane and NGL from approximately 4 billion scf/d of sales gas. Japan's JGC Corp. was awarded the contract for the Hawiyah NGL and related facilities, consisting of three (3) NGL recovery trains, product surge and shipping facilities, utilities, tank and process control system. Snamprogetti will carry out the work related to gas treating and compression facilities to include inlet distribution, two (2) gas treating trains, sales gas compression, and electrical system and support facilities. Contracts for communication, plant infrastructure facilities and temporary camp and catering services were signed with local contractors: General Telecom & Engineering (GTE), Modern Arab Construction (MAC) and National Engineering Services and Marketing Agency (NESMA). --More 2348 Local Time 2048 GMT