2 has started, the PAEC authorities have been directed to accelerate their efforts to install 13 more nuclear power plants, both with the local and foreign financial and technical support.
Chashma-2 will be completed in 2011 at a revised cost of (...)
2 has started, the PAEC authorities have been directed to accelerate their efforts to install 13 more nuclear power plants, both with the local and foreign financial and technical support.
Chashma-2 will be completed in 2011 at a revised cost of (...)