The Directorate-General of Water in Baha region is currently executing a number of projects amounting to more than SR 2.2 billion within the framework of the 8th Five Year Plan 1425/1430 H. The Director-General of Water Directorate in the region Eng Mohammed bin Mansour Al Odhaid has pointed out that the projects being executed in the region include infrastructure projects for water networks, water pipelines, pump stations, a strategic water reservoir with a capacity of 50,000 cubic meters and drainage networks.