throwers per day. According to Deputy Municipal and Rural Affairs Minister Dr. Habib Zainulabedin, the specifications, design, implementation and operation of the bridge will be according to the highest standards. In the second stage, the bridge will rise to a 10-floor level and will accommodate 5 million pebble-throwers per day. It will also have three tunnels and structures and will carry the possibility of more development in the future. The construction of concrete buildings accommodating hundreds of thousands of pilgrims and equipped with early warning systems on the foot of mountains is contemplated. --MORE 1104 Local Time 0804 GMT