Construction of two pressurized water nuclear reactors began in 1974 with the help of German contractor Siemens and French scientists. The Bushehr I reactor was 85 percent complete and the Bushehr II reactor was partially complete prior to the 1979 Iranian Revolution. With the fall of the shah in the 1979 revolution, the project was halted. The site was then damaged during the 1980-1988 Iran